BELO MONTE HYDROELECTRIC PLANT { 71 images } Created 18 Feb 2020

twitterlinkedinfacebook
View: 100 | All

Loading ()...

  • Altamira, Brazil - April 12 of 2014:   Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    01_PB_altamira12-05-2014_2249.TIF
  • Altamira, Brasil - April 14 of 2014:  Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    03_PB_altamira14-05-2014_3100.TIF
  • Altamira, Brasil - April 14 of 2014:  Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    23_PB_altamira14-05-2014_3096.TIF
  • Altamira, Brasil - April 12 of 2014:  Cattle traffic in Transamazonica road. Photo: Caio Guatelli
    09_PB_altamira12-05-2014_0701.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at end of day leave Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    10_PB_altamira14-05-2014_4903.TIF
  • Altamira, Brasil - April 15 of 2014:    Workers at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    11_PB_altamira15-05-2014_5448.TIF
  • Altamira, Brasil - April 15 of 2014:    Workers at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    12_PB_altamira15-05-2014_5385.TIF
  • Altamira, Brasil - April 12 of 2014:  Workers at Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    13_PB_altamira12-05-2014_1161.TIF
  • Altamira, Brasil - April 14 of 2014:  Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    14_PB_altamira14-05-2014_3186.TIF
  • Altamira, Brasil - April 14 of 2014:  Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    15_PB_altamira14-05-2014_3198.TIF
  • Altamira, Brasil - April 14 of 2014:  Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    16_PB_altamira14-05-2014_3171.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    17_PB_altamira14-05-2014_3397.TIF
  • Altamira, Brasil - April 15 of 2014:    Workers at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    18_PB_altamira15-05-2014_5185.TIF
  • Altamira, Brasil - April 14 of 2014:    Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    19_PB_altamira14-05-2014_3567.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    25_PB_altamira14-05-2014_3413.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    26_PB_altamira14-05-2014_3479.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    22_PB_altamira14-05-2014_4554.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    20_PB_altamira14-05-2014_3639.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli
    21_PB_altamira14-05-2014_3679.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    24_PB_altamira14-05-2014_4779.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    27_PB_altamira14-05-2014_4717.TIF
  • Altamira, Brasil - April 14 of 2014:   Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    28_PB_altamira14-05-2014_3209.TIF
  • Altamira, Brasil - April 14 of 2014:   Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    29_PB_altamira14-05-2014_3325.TIF
  • Altamira, Brasil - April 12 of 2014:  Adones Thimoteo dos Santos, 76, the oldest  Belo Monte Site worker. Photo: Caio Guatelli
    30_PB_altamira12-05-2014_1961.TIF
  • Altamira, Brasil - April 12 of 2014:   A worker at Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli
    31_PB_altamira12-05-2014_1229.TIF
  • Altamira, Brasil - April 12 of 2014:   Workers and trucks at Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    32_PB_altamira12-05-2014_1523.TIF
  • Altamira, Brasil - April 12 of 2014:  Adones Thimoteo dos Santos, 76, the oldest  Belo Monte Site worker. Photo: Caio Guatelli
    33_PB_altamira12-05-2014_1921.TIF
  • Altamira, Brasil - April 14 of 2014:   Leandro Marcatto, Supply Chain Manager, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    34_PB_altamira14-05-2014_4184.TIF
  • Altamira, Brasil - April 13 of 2014:   Canais site, an append of Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant . Photo: Caio Guatelli
    35_PB_altamira13-05-2014_2564.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers taking their rest after lunch inBelo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    40_PB_altamira14-05-2014_3218.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli Belo Monte Plant, when finished, will be the third biggest hydroelectric power plant built on earth generating 11,233 MegaWatts, just behind Brazil's Itaipu (14,000 MW) and China's Three Gorges Dam (22,500MW).
    41_PB_altamira14-05-2014_4756.TIF
  • Altamira, Brasil - April 14 of 2014:   Giovani Maciel Barros, 27 years old, from Luís Corrêa - Piauí, function: armador at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    42_PB_altamira14-05-2014_4890.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at end of day leave Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    43_PB_altamira14-05-2014_4906.TIF
  • Altamira, Brasil - April 14 of 2014:  Operarios trabalham em obra de instalação do sistema de esgotos da cidade  . Photo: Caio Guatelli
    44_PB_altamira14-05-2014_4928.TIF
  • Altamira, Brasil - April 14 of 2014:   Workers at end of day leave Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    45_PB_altamira14-05-2014_3531.TIF
  • Altamira, Brasil - April 14 of 2014:    Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    46_PB_altamira14-05-2014_4996.TIF
  • Altamira, Brasil - April 14 of 2014:   Eduardo Souza Ribeiro, 25 years old, from Codó - Maranhaão, function: Partequeiro,  -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    47_PB_altamira14-05-2014_3704.TIF
  • Altamira, Brasil - April 14 of 2014:   Antonio Filho Pereira dos Santos, 35 years old, from Balsas - Maranhão, function: , Ajudante de produção -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    48_PB_altamira14-05-2014_3730.TIF
  • Altamira, Brasil - April 14 of 2014:   Lucio Dario Gilvan, 37 years old, from Mata Grande, function: Carpenter,  -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    49_PB_altamira14-05-2014_3733.TIF
  • Altamira, Brasil - April 14 of 2014:   Divanildo Calda Santos, 38 years old, from Balsas - Maranhão, function: Carpenter,  -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    50_PB_altamira14-05-2014_3738.TIF
  • Altamira, Brasil - April 14 of 2014:   Leonildo da Silva, 42, from Imperatriz - Maranhao, function: Bricklayer -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    51_PB_altamira14-05-2014_3742.TIF
  • Altamira, Brasil - April 14 of 2014:   Eneas Rosa de Souza, 24, from Sao Luis - Maranhao, function: , Montador de Andaimes -  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    52_PB_altamira14-05-2014_3745.TIF
  • Altamira, Brasil - April 14 of 2014:   Marcos Aurelio dos Santos, 36 years old, from Pires do Rio - Goias - function: Armador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    53_PB_altamira14-05-2014_3753.TIF
  • Altamira, Brasil - April 14 of 2014:   Degivaldo Silva, 31years old, from Maceió - Alagoas - function: Armador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    54_PB_altamira14-05-2014_3761.TIF
  • Altamira, Brasil - April 14 of 2014:   Adeilson Prereira dos Santos, 28 years old, from Luis Correa - Piauí - function: Soldador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    55_PB_altamira14-05-2014_3773.TIF
  • Altamira, Brasil - April 14 of 2014:   Murilo Gonçalves dos Santos, 39 years old, from Cabrobó - Pernambuco - function: Soldador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    56_PB_altamira14-05-2014_3776.TIF
  • Altamira, Brasil - April 14 of 2014:   Leandro Pinto Machado, 26 years old, from Tucuruí - Pará, Function: Soldador,  in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    57_PB_altamira14-05-2014_3856.TIF
  • Altamira, Brasil - April 14 of 2014:   Vanildo Geronimo dos Santos, 30 years old, from Paulo Afonso - Bahia, function: Mecanico Montador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    58_PB_altamira14-05-2014_4209.TIF
  • Altamira, Brasil - April 14 of 2014:   Luis Fernando, 24 years old, from Arari - Maranhao, function: carpenter, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    59_PB_altamira14-05-2014_4222.TIF
  • Altamira, Brasil - April 14 of 2014:   Joao de Melo, 34 years old, from Canindé de São Francisco - Sergipe, function: carpenter, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    60_PB_altamira14-05-2014_4246.TIF
  • Altamira, Brasil - April 14 of 2014:   Adnir Antonio de Souza, 39 years old, from Barão de Grajaú - Maranhão, function: encarregado de ontagem de andaime, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    61_PB_altamira14-05-2014_4248.TIF
  • Altamira, Brasil - April 14 of 2014:   Diego Filho, 22 years old, from São Luís - Maranhão, function: Carpenter, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    62_PB_altamira14-05-2014_4255.TIF
  • Altamira, Brasil - April 14 of 2014:   Gilson Jose Lopes dos Santos, 30 years old, from Tucurí - Pará, function: Montador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    63_PB_altamira14-05-2014_4263.TIF
  • Altamira, Brasil - April 14 of 2014:   Flavio da Silva Souza, 32 years old, from Porto - Piauí, function: Montador, in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    64_PB_altamira14-05-2014_4267.TIF
  • Altamira, Brasil - April 14 of 2014:   Osni Guimarães Lima, 22 years old, from Araguaína - Tocantins, function: Encarregado de Montagem in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    65_PB_altamira14-05-2014_4463.TIF
  • Altamira, Brasil - April 14 of 2014:   Douglas Araujo, 23 years old, from Belém - Pará, function: Montador in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    66_PB_altamira14-05-2014_4467.TIF
  • Altamira, Brasil - April 14 of 2014:   Raimundo gomes Nunes Marques, 20 years old, from São Luís - Maranhão, function: Ajudante Geral in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    67_PB_altamira14-05-2014_4475.TIF
  • Altamira, Brasil - April 14 of 2014:   Anderson Dias, 36 years old, from Tacinópolis - Tocantins, function: Operador de guindaste in Belo Monte Site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    68_PB_altamira14-05-2014_4479.TIF
  • Altamira, Brasil - April 14 of 2014:   Francisco das Chagas Honorato, 44 years old, from Piripiri - Piauí, function: Pedreiro at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    69_PB_altamira14-05-2014_4802.TIF
  • Altamira, Brasil - April 14 of 2014:   Paulo Souza Marin, 27 years old, from Porto Franco - Maranhão, function: Pedreiro at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    70_PB_altamira14-05-2014_4811.TIF
  • Altamira, Brasil - April 14 of 2014:   Marco Antonio Silva de Souza, 23 years old, from Tucuruí - Pará, function: Meio-oficial de Pedreiro at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    71_PB_altamira14-05-2014_4817.TIF
  • Altamira, Brasil - April 14 of 2014:   Adalberto Pacheco, 29 years old, from Vitória do Neari - Maranhão, function: Mecânico Montador at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    72_PB_altamira14-05-2014_4861.TIF
  • Altamira, Brasil - April 14 of 2014:   Giovani Maciel Barros, 27 years old, from Luís Corrêa - Piauí, function: armador at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    73_PB_altamira14-05-2014_4866.TIF
  • Altamira, Brasil - April 14 of 2014:   Honario Ferreira Aguiar, 29 years old, from Palmeiras do Tocantins - Tocantins, function: Armador Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    74_PB_altamira14-05-2014_4919.TIF
  • Altamira, Brasil - April 14 of 2014:   Arlen Silva, 23 years old, from Tucuruí - Pará, function: Armador, at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    75_PB_altamira14-05-2014_4923.TIF
  • Altamira, Brasil - April 14 of 2014:   Andre Gonçalves, 39 years old, from Recife - Pernambuco, function: Bus driver, at Pimental site, an append of Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    76_PB_altamira14-05-2014_4936.TIF
  • Altamira, Brasil - April 15 of 2014:    Helio Souza, 28 years old, from Altamira - Pará, position: Operador de Carregadeira,  at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    77_PB_altamira15-05-2014_5459.TIF
  • Altamira, Brasil - April 15 of 2014:    Luis do Carmo, 29 years old, from Codó - Maranhão, position: Ajudante de Manutençã,  at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    78_PB_altamira15-05-2014_5487.TIF
  • Altamira, Brasil - April 15 of 2014:    Cesar, Engineer, from Campinas - São Paulo, at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    79_PB_altamira15-05-2014_5500.TIF
  • Altamira, Brasil - April 15 of 2014:    Gutemberg Cruz, 30 years old, from Altamira - Pará, position: Press Officer, at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    80_PB_altamira15-05-2014_5512.TIF
  • Altamira, Brasil - April 15 of 2014:    Duílio Diniz de Figueiredo, Norte Energia's president, at Belo Monte site, the place where Norte Energia and CCBM are building Belo Monte hydroelectric plant. Photo: Caio Guatelli
    81_PB_altamira15-05-2014_5564.TIF